As far as it is possible to estimate the cost of

work at the present moment, when prices are changing

rather rapidly, we are opinion that the construction

of the breakvater extension as proposed by us for about

700 ft. in length will cost approximately $630,000. Should

it be found necessary at a later date to fill up the angle

B with wave-breaker blocks, we satinate that if blocks to

the extent shown on the drawing were deposited the total

cost of these blocks would amount to gɔ6,000. We would

1

not however recommend that all the blocks should be deposit

-ed in the first instance.

11. With reference to the Forth Entrance of the

Hrbour, Stonecutter Island gives some protection in the case of westerly gales, and we understand that the same difficulties have not occurred here as at the Southern Entrance. We are very unwilling to recommend any addi - tional works at this entrance as the cost of such works, ewing to the depth of water, would be very considerable. We have, however, shown by dotted lines such works as vi consider might be necessary to fully protect this entrance, but we do not recomend that they should be carried out at present. It is difficult to increase the protection of this entrance very much without at the same time increasing

It must always be the difficulty of craft entering.

recognised that there will be some little trouble at the entrance to every harbour, and this harbour of refuge is

We have made no no exception to the general rule. estimate for the works at the northern entrance, owing to the fact that we have suggested they should not be carried out at the present time.

12.

With reference to the detritus which has been